“Techno-Economic Optimization of PV-BESS Peaker to Replace Thermal Plants: A Case Study of the Madura PV-BESS Project, Indonesia” (2026) Journal of Technology and Policy in Energy and Electric Power, 2(1), pp. 147–154. doi:10.33322/saqnvt88.